Mono-tube.org.uk
  • Contents
  • Technical Issues
    • Boilers
    • Boilers Gallery
    • Fires
    • Ancilliaries
    • Hulls
    • The Question of Propellers
  • Gallery
  • Historical
    • Origins of the mono-tube boiler
    • 1879 Steam Canoe Nina
    • 1908 Steam Canoe
    • 1979 Steam Canoe - Sirius 6
    • The Dutch Canoe Sirius
  • Mono-tube Drools
  • Component Suppliers
  • Interesting Links
  • Downloads
  • About Us

This pages leads to the long winded Blog about building a mono-tube stem boiler by a non engineer.  Each link goes to a separate stage usually with dates to show how long the overall task has taken.

  • 24 July 2023 - Which Design?
  • 12th August 2023 - Arranging the Coils
  • 19th September - Bending Exercises
  • 28th October 2023 - Designing the Casing
  • 10th November 2023 - Planning the Plumbing
  • 18th December - CAD Conundrums
  • 18th February 2024 - Bent Metal
  • 25th March 2024 - Assembly
  • 6th May 2024 - The fiddly bits and final insulation
  • 28th August 2024 - The Manifold
  • 15th October 2024 - More Plumbing
  • 11th November 2024 - Funnel Fumbles
  • 28th December 2024 - More Funnel Fumbling
  • 15th March 2025 - More plumbing or Final Assembly?
  • 7th April 2025 - Funnel again
  • 1st June 2025 - Non-Flexing Rolf Style Pump
  • 19th August 2025 - A little bit of Hydro
  • 5th September 2024 - Pump Problems
  • 26th September - No More Water!
  • 25th March 2026 - Computer Conundrums
  • 28th March 2026 - Ethernet Explorations
  • 29th March 2026 - Back on Track
  • 12th April 2026 - And now for some screens
  • 18th May 2026 - Screens Again
  • 23rd May 2026 - The Multiplexer
  • 13th June 2026 - Thinking about the Pump(s)
  • 20th June 2026 - Batteries and their management
  • 30th July 2026 - Gathering the loose ends

Copyright 2026. Built with Concrete CMS.
Log in